The new Austrian standard B 2538:2018 02 01 has been available on the market for about a month now.
This standard is used for the planning, construction an testing of water distribution systems and their components outside buildings in addition to Austrian standard EN 805.
If you haven't purchased the new standard yet or if you just want to know which topic covers this standard, you will find it on the following link:
Date: 05.03.2018
The new Austrian standard B 2503:2017 11 01 has been available on the market for about a month now.
This standard applies to the testing of newly constructed and refurbished sewage pipelines, shafts, inspection openings and containers. It contains specifications for testing pipes with air or water. Likewise this standard specifies requirements for the testing of shafts, inspection openings and containers with water.
If you haven't purchased the new standard yet or if you just want to know which topic covers this standard, you will find it on the following link:
Date: 01.12.2017
We want to thank the company Amex GmbH for the invitation to the trade fair "Water Berlin" and the culinary night.
It was a great night with an amazing dinner.
Date: 10.04.2017
From now on we are on Facebook, Twitter, Google+, and Xing.
We update you with informations all around our company and our sector.
Date: 24.03.2017
On 10th March 2017 was our info day with the company
Saubermacher Dienstleistungs GmbH.
We were allowed to explain our task a bit and enjoyed a pleasant afternoon with interesting technical discussions.
I'm pleased about the numerous participation an a thank you to Mr. Herbert Egger, who honored us with his expertise.
Date: 24.03.2017
From today on, we will mostly receive our electricity from a photovoltaic system.
Thanks to the specialists of the E-Lugitsch-company, the setup was relatively easy and fast.
Date: 16.03.2017
The new Austrian standard for the proof of tightness and stability by means of pressure testing of water-bearing, new and existing pipelines.
These include:
The following are excluded:
This standard applies to all pipe materials.
Date: 15.09.2015
Today we have checked the entire snowmaking system of Hochwurzen according to the latest
Austrian standard B 5050 for the tightness.
We would like to thank all employees of Planai-Hochwurzen-Bahnen for their confidence and hope for further good cooperation.
If you are interested, you can see some pictures here.
Date: 29.09.2016